Employees: Submit Your Work Entries Here

Technician Name:
Customer:
Furnace Type:
Call Type:
Location:
Date of Service:
Annual Service Parts Used: -5 nozzle
-8 nozzle
-3 nozzle
BG air filter
Reznor air filter
Steel mesh filter -- #, if checked:
Reznor O Rings
Shen O Rings
Hot Filter Therm

Black Gold Parts Used: BG air compressor
Air compressor vanes
Air Compressor by-pass
Nozzle Assembly
Nozzle block pigtail
Female burner plug
Male burner plug
Combustion air fan
Burner coupler
BG electrodes
Hot Filter band
1/8in fuel line -- #, if checked:

Reznor Parts Used: 1/8in fuel line
30 watt heater
Air compressor
235 access door
235 target shield
350 access door
Air proving switch
Combustion air fan
Electrodes
Fan limit panel 235
Fan limit panel 350
Nozzle Sensors -- #, if checked:
Pre-heater sensors -- #, if checked:
Reznor 500 nozzle
Pre-heater rewire
Post purge relay
Power Switch
Retention head
Ready Light -- #, if checked:

Shenandoah Parts Used: 300 watt air heater
200 watt oil heater
160 temp sensor
140 temp sensor
Air proving switch
Amber Ready Light
Green Ready light
Red ready light
Electrodes
Regulator Kit
Transformer bus bars
235 target shield
350 target shield
125-175 target shield

Omni Parts Used: Omni electrodes
Omni transformer
Omni heater element
Omni thermo coupler
Omni temp sensor

Clean Burn Parts Used: Clean Burn Electrodes
Clean Burn transformer
Clean Burn Air proving switch

Fuel Supply Parts Used: 7710 Waste oil pump
7740 Waste oil pump
235 rpm pump motor
275 rpm pump motor
410 rpm pump motor
Misc. rpm pump motor
Spin on filter head
Fuel pick up assembly
Brass fittings -- #, if checked:
3/4 ball valve -- #, if checked:
Tank flange -- #, if checked:
1 psi check valve
40 psi check valve
Copper tubing -- #, if checked:
30 psi gauge
60 psi gauge
Vacuum gauge
Pump coupler

Misc. Parts Used: 2nd Chance
MC Cable -- #, if checked:
Gasket Material -- #, if checked:
Wall Thermostat
Thermostat wire -- #, if checked:

Chimney Parts Used: 8in. chimney pipe -- #, if checked:
6in. chimney pipe -- #, if checked:
8in. barometric dampner
8in. tee -- #, if checked:
8in. 90 -- #, if checked:
8in. cap -- #, if checked:
8in. topper
8in. draw band -- #, if checked:
6in. draw band -- #, if checked:
6in. barometric dampner
6in. tee -- #, if checked:
6in. 90 -- #, if checked:
6in. cap -- #, if checked:
Vulcom -- #, if checked:

Travel Hours:
Work Hours:
Enter Special Notes:


 
Service Call Check List (must complete during all service calls):
  1. Check thermostat & CAD Cell connections
  2. Pull back burner, check electrodes, clean retention head and blow through nozzle, clean nozzle screen and nozzle screen cavity, replace o'ring.
  3. Test transformer. Look to see if combustion air wheel is spinning.
  4. Clean CAD CELL
  5. Bleed and or run furnace for 10-15 minutes, check for vacuum leaks, check vacuum and pressure.
  6. Check air compressor gauge, check by-pass by gently placing finger over hole to raise pressure.
  7. Check combustion air. (4-6 on BG, 4 on Reznor, 4 on Shenandoah 235 & 350, closed & 2 on small Shenandoah's.)
  8. Physically check topper.
  9. Check draft
I completed every step of the Service Call Check List and/or OCH Annual Service Protocol